
as you can see, this is an in-progress section of my moon chapel…bright, woody, and layers of curves. need better people….
it’s 8:30am, and so it’s time for me to sleep…ZZZ..can’t work during the day….gotta work at night…

the cemetery as seen from my moonlit chapel.
working on more vignettes….it’s 5am.
me and joon yang (i totally mispelled his last name in the credits…my bad…it was an all-nighter)…put together a short stop animation film that took some 20 hours to film.
intended to be twice as long, 421 serves as part one, the happy times…

i’ve been trying to think up of a new theme lately. i have a lot of other projects to do, first…but…i’m itchin’ to pull together another radical facelift…keep posted!

my pretty girl
i’ve spent the last little while designing a little “scanner” for my 35mm film to go along with my oly film camera. i’ll show you later, but it’s a simple little thing involving laser-cut plexi, an ipod, and my oly e500 macro. saved like $100, but this test model is kinda ghetto.
update: i created a new section tab (look on the left) for 35mm scans…i’ll keep up on that one!

okay, so i won’t break the suspense, but here’s me being filmed for the opening scene. gotta love the uniqlo sox!

film test shots were taken today for me and joon’s short film: so far untitled…
stay tuned
(sorry, richard. we ripped your whiteboard off the wall..)

i’ve been pumping out studio vignettes like…well…a pump. anyways, just catching up with you, here’s the latest for my 3B project. tree lights.

i posted this one on the blog on the joint site, thecolorless.com, but i couldn’t help but repost…i think i found a perfect blend between film and digital.